The design and construction phase:
- The construction was done by renovating an existing building.
- All construction work was done with local craftsmen and local companies.
- The materials, as far as possible, were purchased locally.
- Only high-performance materials were used to ensure insulation.
During the season:
- We carry out door-to-door collection for a differentiated garbage collection as close to 100% as possible.
- We use well water for the houses and recovered rainwater for irrigation.
- The four villas and the Fontanina are zero emission (all electric).
- We use electricity entirely from certified renewable sources.
- We are trying to completely eliminate single-use plastics, example. ice cream spoons, straws..
- We have internal electric mobility.
- We use “Ecofriendly” detergents.
- Our gardening tools are for 75 % electrics.
- We do not use chemical fertilizers or chemical herbicides.